In this video the arc welding robot installation is configured as an installation with 3 welding stations. The installation can also be adjusted to an installation with 2 welding stations when required.
Station 1 and station 3 are used for welding the sub-assemblies. In station 2 the final assembly of the products is done. This provides the customer an efficient and continuous welding process. The flexibility of changing the installation into 2 or 3 welding stations gives the customers the possibility to work in the most efficient way. The products are programmed by the offline programming software DTPS.
See the video of this arc welding robot installation below: