Logo

New Valk Mailing shows where the return lies

Thirteen years after purchase, Onillon et Fils gets 30% more operating hours out of the same welding robot. You can read how in the new Valk Mailing. This edition shows how software makes the difference in manufacturing, with stories from across Europe.

Kent Stainless in Ireland, for example, shows how a robot program made with ARP (Automatic Robot Programming) is ready in minutes instead of hours. There are also steps to be taken around the welding robot. Together with one of our partners, we show how automated storage towers and AGVs alongside the welding robots can ensure one production flow in which everything fits together.

In Belgium, C-Metal shows that using welding automation in the production of steel beams can reduce production time from approximately 90 to around 8 hours. Anyone who wants full insight into the returns an installation achieves and how it performs can read in the article on the Management Information System (MIS) how that is possible, right down to the level of the individual weld.

Finally, the return does not come from technology alone. Collaboration counts too. TK Home Solutions welds hundreds of unique tube parts per day and, together with Valk Welding, found improvements that nobody had asked for in advance. RK Metals grew in two years from a single workstation to a robotic welding shop and Kent Stainless came back for a second system.

Download the new Valk Mailing and read the stories behind these results.

Novinky

Kontakt

Jsme rádi, že spolu s vámi budeme moci hledat řešení vašich problémů týkajících se (svařovací) automatizace, svařovacích drátů a spotřebního materiálu. Dáváme přednost být vice partnerem než dodavatelem.