This new hall is an absolute must for Valk Welding in order to keep up with the growth the company is experiencing the last couple of years. With the expansion of the Valk Welding network on the Scandanavian market into Sweden this year and the start of Valk Welding PL in Poland as of May 1st, Valk Welding wants to be able to respond to the increasing market demand in whole of Europe (and beyond).
Sustainability
With the new assembly hall, Valk Welding wants to proceed with sustainability. This is the reason why the CEO , Remco H. Valk has decided that “grey-water tanks” will be installed, which will collect the rainwater, which will be used for flushing toilets in the new building. In addition to this, the lighting system is realised by LED, as it is already used in the present buildings in use. The installed heating system is re-using energy in order have the lowest gas consumption for the heating of the new assembly hall. In addition to the above, Valk Welding has prepared the roof in such a way that in the near future, solar panles will be installed as soon as the annual energyconsumtion of this new hall will be known.