BAST manufactures cabin sections, door-frames and parts, frames, brake systems, coverings for air conditioning systems and switchboards, voltage converters, security components, battery compartments and other articles for rail vehicles. Its clients include well-known manufacturers such as Siemens, Alstom, Bombardier and Knorr-Bremse. Over 230 people work in two and or three shifts in a production area of 24,000 m2. For the processing of stainless steel and aluminium the company has an extensive CNC machinery plant for plate processing, welding and coat-ing, in which MAG, MIG, TIG, laser welding and resistance spot welding are used.
2 Welding robots serving 3 work stations
"In the call for tenders in the spring of 2014 we chose Valk Welding as our robot integra-tor for their comprehensive knowledge and experience in the area of robot welding and their solutions for small series productions that result in high productivity and profitabil-ity", explains Miroslav Bazala. Valk Welding delivered a comprehensive sys-tem consisting of two Panasonic TA-1900WGH3 welding robots mounted on a gantry structure serving 3 work stations. Both welding robots move on an 18-metre track for that purpose. The first work station, with a load capacity of 6,000 kg, is intended for single axis position-ing and is therefore equipped with a posi-tioner. The center work station is equipped with a two-axis drop center positioner with a 1,500 kg load capacity. A third work station is equipped with an indextable with two posi-tions and has a load capacity of 250 kg for smaller parts. The 3 work stations are set up in such a way that it is possible to position and process virtually all of the products and parts that BAST produces for the railroad sector.