Metal-Fach already had experience in robotic welding. But they faced with limitations due to the lack of a well-functioning tracking system, especially in welding workpieces with large tolerances. Mr. Mr. Michaluk, Process Engineer: “The programs had to be adjusted manually, which takes a lot of time and did not provide a consistent welding quality. We want to deliver products of the highest quality, so we need only proven solutions to meet our requirements. The use of welding robots plays a crucial role for quality and efficiency.” For this reason, Metal-Fach has started an intensive search for a reliable partner in this field.
Complex phase of tests
Valk Welding has performed a serie of weld-ing demonstrations at the technical center in Mosnov CZ ,for the products provided by Metal-Fach. Numerous reference visits were also made to Valk Welding customers. Also of the offline programming process of a trailer frame element in the offline DTPS software was presented.
After the reference visits and welding tests, Metal-Fach decided to choose the technology and "knowhow" of Valk Welding. It tookes two years, from the first meeting with Metal-Fach staff, until the first order was signed. This time was needed to build the right relationship at mutual trust between companies. It also enabled Metal-Fach to prepare more programming friendly constructions for robotic welding.